Posts in VDU
Vacuum Ejector Performance Break

Understanding vacuum ejector performance is the key to maintaining reliability and distillate yields. A low VGO yield may result from a breaking ejector system, but bypassing a fouled inter-condenser can restore lost yield.

Read More
VDUGrant Niccum
Vacuum Unit Fired Heater Coking - Avoid Unscheduled Shutdowns

Poor heater design leads to unscheduled Vacuum Unit fired heater shutdowns due to coke formation. Oil film temperature and residence time are the variables that determine the rate of coking for a given crude oil blend. Proper heater design and operation controls oil residence time and oil film temperature, allowing refiners to maximize heater run length.

Read More
VDUGrant Niccum
Vacuum Unit Pressure Control: Impact on Refinery Profitability

Good vacuum column pressure control is essential to a successful revamp when vacuum column diameter is the primary unit limit. Poor pressure control can lead to massive entrainment of VTB into HVGO. This is especially significant with heavy crudes with high metals and carbon residue, where entrainment causes a rapid rise in the metals and carbon residue of the HVGO product. This article primarily addresses controlling vacuum column flash zone pressure through the design and operation of the first stage ejector pressure control system.

Read More
VDUGrant Niccum